|
Hanson-Wilson Inc. designed three separate projects
at the Burlington Northern and Santa Fe Railway Company's Barstow,
CA Maintenance Facility:
- Running Repair Facility Addition: This project nearly
doubled the existing running repair facility, which provides light
locomotive repair. The expansion included lengthening the maintenance
tracks and access platforms in the building.
- Locomotive Wash Facility: The new wash facility has four
main functional areas:
1) the inbound drip pad area; 2) the wash bay; 3) out-bound
drip pad area. 4) support area which houses the equipment, tanks,
pumps, and controls.
- Industrial Wastewater Treatment Facility: includes new
influent pump stations, screen, oil/water separator, storm water
holding tank, dissolved air flotation clarifier, chemical feed
system, and effluent sand filtration.
|