|
|
 |
Inland Empire Maintenance Facility Metrolink
 |
 Hanson-Wilson
Inc. has full-responsibility for the construction management of a passenger
train maintenance facility adjacent to the Burlington Northern and Santa
Fe Railway Company (BNSF) San Bernardino Subdivision, at a site just east
of the historic San Bernardino, CA Depot. The project also includes rehabilitation
of the first mile of Metrolink passenger service extension to Redlands.
Team Members include a Resident Engineer, Office Engineer, Coordinator,
Lead Inspector and Technical Assistant. Team Members pay strict adherence
to document control requirements and Caltrans and FTA guidelines through
Metrolink's comprehensive document control system. Client representation
in change management, cost control and closeout is a function of the Team.
The maintenance facility site is adjacent to BNSF's busy transcontinental
main line track, which requires coordination with BNSF safety personnel.
Also, the project requires maintaining service to freight customers on
the Redlands Branch during track construction.
|
 |