Johnson County's Public Works Department sought
improvements for a 2.82 mile segment of 175th Street form Clare
Road to US 169 to provide system continuity as a vital part of providing
a cross link for future traffic between US 169 and the industrial
airport.
Wilson & Company engineers studied four alignments from which
the recommended alternate was determined. Though a series of public
information meetings, relevant and vital information about the proposed
alternates was collected from adjacent landowners. These public
meetings were conducted through a joint effort of Johnson County
Public Works and Wilson & Company.
Wilson & Company then designed improvements based on the approved
alternate consisting of two 12-foot lanes with a 10-foot shoulder
on each side. The project was completed to Kansas Department of
Transportation (KDOT) design standards using KDOT's format.
PROJECT HIGHLIGHTS:
- Alignment study
- Preliminary plans
- Field check plans
- Office check plans
- Final plans
- Traffic analysis
- Rights-of-way and easements
- Drainage improvements
- Pavement markings
- Traffic through construction
|