Radio Telemetry/ SCADA System Blue Springs, Missouri |
||
|
Supervisory Control and Data Acquisition (SCADA) System. This project provided a new SCADA system for control and monitoring of the City's water distribution system. |
|||
![]() |
|||
![]() |
Corrosion and Cathodic Protection Services |
||
|
Wilson & Company has a diversified staff of electrical, mechanical, environmental, and civil engineers that have performed investigations and designs to mitigate the damaging and costly effects of corrosion. |
|||
![]() |
|||
![]() |
Chiller Plant Dwight D. Eisenhower VA Medical Center Leavenworth, Kansas |
||
|
The chiller plant was part of a larger project including a new Domiciliary/ Dietetic building. With significant planned expansions, the medical campus was in urgent need of an additional 1,500 tons of chiller water capacity. |
|||
![]() |
|||
![]() |
Electric Power and Rate Study Horton, Kansas |
||
|
The City of Horton, Kansas, has had an interesting history in the electrification of Kansas, including supplying power to the first REA project in the state. |
|||
![]() |
|||
![]() |
Electric System Study Seneca, Kansas |
||
|
The City of Seneca has operated the electric system in a progressive manner. Over decades of operation, the demand for electrical power has steadily grown. |
|||
![]() |
|||
![]() |
I-25 Roadway Lighting Design Colorado Springs, CO |
||
|
As part of the design package, Wilson & Company provided the lighting design for the new eight-lane roadway. Cutoff fixtures were used. |
|||
![]() |
|||
![]() |
Radio Telemetry / SCADA System Ruidoso, New Mexico |
||
|
Wilson & Company provided the design of the radio telemetry/ Supervisory Control And Data Acquisition (SCADA) system for monitoring and control of the water distribution system. |
|||
![]() |
|||
![]() |
Lakewood Middle School Salina, KS |
||
|
The Lakewood Middle School was a new middle school designed to accommodate 1,000 students. The 159,000 SF facility is masonry and steel frame construction with an automatic sprinkler system throughout. |
|||
![]() |
|||
![]() |
Central High School, Salina, KS |
||
|
This project is a $5.2 million dollar HVAC and Electrical system renovation for the 210,000 square foot high school. The work included new heating/cooling infrastructure, VAV system with roof mounted air handling units, new ceiling and lights, and technology upgrades. |
|||
![]() |
|||
![]() |
Area Technical School, Salina, KS |
||
|
This project is a $5.5 million dollar small campus for the Technical School. The work included two new buildings with a combination of classroom and shop space in each building. The project included site master planning for future growth to the facilities. |
|||
![]() |
|||
![]() |
Circle, USD # 375, Towanda, KS |
||
|
This project included a new K-3 Elementary, new Middle School, renovations to two existing elementary schools and an auditorium addition to the existing Circle High School. All project objectives were achieved while the project bids were significantly under the school bond budget. |
|||
![]() |
|||