US Development Ethanol Temporary Union Pacific Railroad (UPRR) Unload Facility - Rialto to Colton, CA

To temporarily meet the demand of the new California ethanol mixture requirement for 2010, US Development hired Wilson & Company to design the grading and track layout for the temporary unloading ethanol facility. This transload facility was permitted for one year to allow the design and permitting of the permanent adjacent facility. Wilson & Company duties included coordination and acceptance processing through the UPRR and local agencies; utility relocation, protection, and coordination; and final permitted plans for grading, utility, roadway, and track design.