Rock Creek Corridor: Phase II Plan
Mission residents call the Rock Creek Trail a hidden gem, and too often that description is literal. Along the western segment of the corridor, between Metcalf Avenue and Woodson Road, trail users face fragmented connections, confusing street crossings, poor lighting, and limited wayfinding. The trail runs through a large floodplain with persistent runoff and silt problems and limited shade. Next to it, Martway Street carries heavy traffic from Metcalf Avenue and Johnson Drive while cyclists ride in 5-foot painted bike lanes with no physical separation. Residents named the Lamar Avenue and Martway Street intersection as one of the hardest places in the city to cross on foot or by bike, and 57 percent of all crashes in Mission occur at intersections.
With funding from the Mid-America Regional Council (MARC) Planning Sustainable Places (PSP) program, the City of Mission engaged Wilson & Company and a multidisciplinary team to complete Phase II of the Rock Creek Corridor plan. The team built on the Phase I plan for the eastern corridor to deliver one unified vision for the 1.65-mile Rock Creek Trail and the 1.4-mile Martway Street corridor.
The team analyzed transportation, land development, environmental, and utility conditions within a 300-foot study buffer and tested its findings through various engagement activities, from a Walk + Roll audit to focus groups with retirement community residents and adjacent property owners. The resulting plan delivers:
- Two trail concepts, a near-term enhancement of the existing alignment and a long-term creekside realignment with raised boardwalks
- A 22-treatment safety countermeasure toolbox aligned with the Mission Safe Streets Plan
- A protected cycle track for Martway Street that fits within the existing curb-to-curb width, avoiding right-of-way acquisition and curb reconstruction
- Sensory wayfinding, crime prevention through environmental design, and green infrastructure strategies
- A three-step implementation framework with planning-level costs, escalation guidance, and identified funding sources
The plan gives the City a clear, scalable roadmap it can advance one element at a time as funding becomes available, including safety treatments coordinated with a planned 2030 Martway Street resurfacing project. The plan was finalized on March 31, 2026, and adopted by the City Council on April 15, 2026.