Power Lake Dam Rehabilitation
Power Lake Dam dates to 1929, when it began generating hydroelectric power for the City of Santa Rosa from El Rito Creek. Over time, the lake behind it became the heart of community fishing and recreation in Santa Rosa. The original dam paired a 50-foot concrete spillway with a 400-foot earthen embankment. In 2002, crews breached the aging dam, removing its gate and part of its concrete wall and cutting a channel through the sandstone at the south abutment. The lake dropped about six feet below normal pool. The Office of the State Engineer (OSE) approved a reconstruction design in 2010, but the project sat unbuilt for more than a decade while costs climbed.
When federal recovery funds became available through the OSE Dam Safety Bureau, the City selected Wilson & Company to turn the 2010 design into a buildable, fundable project. Working only from PDF plans, Wilson & Company re-verified quantities, updated the cost estimate, and prepared updated plans, technical specifications, and a federally compliant contract book. The team also added an alternate bid item to dredge sediment trapped behind the dam from major storms since the original construction in 1929.
As the City’s designee and Engineer in Responsible Charge, Wilson & Company led the construction phase. The contractor demolished the old spillway and embankment and built a new facility: a 400-foot reinforced-concrete ogee main dam section founded on bedrock, a 50-foot ogee spillway, a 30-foot reinforced-concrete outlet structure, and a 100-foot earthen embankment. The work also included a stilling basin, a headworks structure, abutment and retaining walls with toe drains, a riprap-armored discharge flume, a steel walkway and platform, outlet control valves, and removal of 16,500 cubic yards of sediment.
Excavation exposed bedrock that did not match the 2010 assumptions, so Wilson & Company redesigned in the field with concurrence and coordination with the Dam Safety Bureau. The team fit the dam to sound rock, detailed treatments for seeping rock fissures, added epoxy-anchored dowels, and redesigned the south abutment wall to double as the outlet-vault walkway. The Dam Safety Bureau approved each change and worked with the engineer to help identify approaches and work through the design of dam adjustments while work continued. In 2025, two flash floods breached the creek diversion, and the team recovered from both.
The dam went into use on October 3, 2026, and the reservoir is back for the first time since 2002. Savings from the bedrock redesigns offset nearly all flood-recovery costs, and construction finished at $9.4 million, $2.8 million (23%) under the $12.2 million budget that was originally set aside. Santa Rosa, the “City of Natural Lakes,” once again has the fishing and recreation that made Power Lake a community gathering place.